go to top scroll for more

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.10: Stretched Pensioners


Citation Cook, P. and Lake, D. Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.10: Stretched Pensioners, ETI, 2013. https://doi.org/10.5286/UKERC.EDC.000202.
Cite this using DataCite
Author(s) Cook, P. and Lake, D.
Project partner(s) BRE, EDF, Peabody, PRP, Total Flow, UCL, Wates
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000202
Download BLD_BU1001_20.pdf document type
Abstract This project looked at designing a supply chain solution to improve the energy efficiency of the vast majority of the 26 million UK homes which will still be in use by 2050.It looked to identify ways in which the refurbishment and retrofitting of existing residential properties can be accelerated by industrialising the processes of design, supply and implementation, while stimulating demand from householders by exploiting additional opportunities that come with extensive building refurbishment.The project developed a top-to-bottom process, using a method of analysing the most cost-effective package of measures suitable for a particular property, through to how these will be installed with the minimum disruption to the householder. This includes identifying the skills required of the people on the ground as well as the optimum material distribution networks to supply them with exactly what is required and when.

This deliverable is number 2 of 8 in Work Package 4. The report presents the development of the framework of an adaptable and scalable supply chain to meet customers’ requirements for whole house retrofit for improved thermal efficiency. The findings to date are derived from workshops held with members of the retrofit industry; in addition to WP4 they also feed into the design interventions developed in WP3. Subsequent work in WP4 will focus on the creation of a supply chain to deliver the detailed design solutions emerging from WP3.  This report presents the development of the framework of an adaptable and scalable supply chain to meet customers’ requirements for whole house retrofit for improved thermal efficiency.

This is Appendix 1.10: Stretched Pensioners - Older people living on social housing estates with limited budgets

Please note this report was produced in 2011/2012 and its contents may be out of date.
Associated Project(s) ETI-BU1001: Building Supply Chain for Mass Refurbishment of Houses
Associated Dataset(s) No associated datasets
Associated Publication(s)

Building Supply Chain for Mass Refurbishment of Houses : Impact of Thermal Efficiency (WP2 D2) - Initial costing methodology in the ETI thermal efficiency model

Building Supply Chain for Mass Refurbishment of Houses : Impact of Thermal Efficiency (WP2 D2) - Refined costing methodology in the ETI thermal efficiency model

Building Supply Chain for Mass Refurbishment of Houses : Impact of Thermal Efficiency (WP2 D2) - Stock archetypes in the UK. Tabulations for the specification of refurbishement solutions.

Building Supply Chain for Mass Refurbishment of Houses : Impact of Thermal Efficiency - Local Area Mapping (WP2 D6)

Building Supply Chain for Mass Refurbishment of Houses : Sustainable Supply Chain - Change management roadmap (WP4 D5)

Building Supply Chain for Mass Refurbishment of Houses : Mass implementation (WP3 D4) Single dweling implementation plan

Building Supply Chain for Mass Refurbishment of Houses : Mass implementation - DfX Workshop Report

Building Supply Chain for Mass Refurbishment of Houses : Mass implementation - Virtual refurbishment report

Building Supply Chain for Mass Refurbishment of Houses : Mass implementation plan (WP 3 D4)

Building Supply Chain for Mass Refurbishment of Houses : Sustainable Supply - Chain Final summary report (WP4 D8)

Building Supply Chain for Mass Refurbishment of Houses : Sustainable Supply Chain - Detailed Supply Chain Workshop - Report (WP4 D5)

Building Supply Chain for Mass Refurbishment of Houses : Sustainable Supply Chain - Detailed Supply Chain Workshop - Report (WP4 D4) Executive Summary

Building Supply Chain for Mass Refurbishment of Houses : Thermal Performance (WP1 D4) - Testing of the ETI thermal efficiency core model

Building Supply Chain for Mass Refurbishment of Houses : Thermal Performance - Determining an energy modelling methodology to be used in the ETI Thermal Efficiency Project (WP1)

Building Supply Chain for Mass Refurbishment of Houses ;Sustainable Supply - Existing Supply Chain Review (WP4 D1)

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Customer Engagement Exercise 1 (WP5 D3)

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Customer Engagement Exercise 2 (WP5 D3)

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Customer Engagement Exercise 2 (WP5 D3) - Appendices

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Defining the Customer

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Methodology (WP5 D2) - Report

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Synthesis Report (WP5 D5)

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Synthesis Report (WP5 D5) - Appendix: Customer Survey Analysis

Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Synthesis Report - Executive summary (WP5 D5)

Building Supply Chain for Mass Refurbishment of Houses: Customer Value -Methodology (WP5 D2) - Executive Summary

Building Supply Chain for Mass Refurbishment of Houses: Impact of Thermal Efficiency (WP2 D1) - Initial Classification of Housing Stock Ttypes

Building Supply Chain for Mass Refurbishment of Houses: Impact of Thermal Efficiency (WP2 D2) - Final costing methodology used in the ETI-TE model

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Change Management Roadmap Report (WP4 D5) - Executive Summary

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2)

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 1: Survey Process Map

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 2: External Wall Process Map

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 4.1: FMEA Workshop Summary Results - Installation Process

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 4.1: FMEA Workshop Summary Results - Survey Process

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 5.1: Workshop Presentation 9th June 2011 : Whole House Retrofit For Thermal Efficiency - “The European Experience”

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 5.1: Workshop Presentation 9th June 2011 : Whole House Retrofit For Thermal Efficiency - “The Survey”

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 5.4: Workshop Presentation 7th September 2011 : Whole House Retrofit For Thermal Efficiency - “Survey Process”

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 5.5: Workshop Presentation 8th September 2011 : Whole House Retrofit For Thermal Efficiency - “Installation Process”

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Draft Supply Chain Scenarios Appendix 5.6: Workshop Presentation 13th September 2011 : Whole House Retrofit For Thermal Efficiency - “Costing Workshop”

Building Supply Chain for Mass Refurbishment of Houses: Customer Segmentation - Draft Supply Chain Design (WP4 D2) Executive Summary

Building Supply Chain for Mass Refurbishment of Houses: Mass Implementation - Technical solutions report (WP3 D3)

Building Supply Chain for Mass Refurbishment of Houses: Mass Implementation -Retrofit and refurbishment case studies (WP3 D2)

Building Supply Chain for Mass Refurbishment of Houses: Mass Implementation -Whole house solutions report (WP3 D3)

Building Supply Chain for Mass Refurbishment of Houses: Mass Implementation Synthesis report (WP3 D7)

Building Supply Chain for Mass Refurbishment of Houses: Policy & Regulation: Benchmarking and Gap Analysis (WP6 D1)

Building Supply Chain for Mass Refurbishment of Houses: Policy & Regulation: Health and safety approach from generic to site specific (WP6 D2)

Building Supply Chain for Mass Refurbishment of Houses: Policy & Regulation: Safety Summary and Planning Report (WP6 D4)

Building Supply Chain for Mass Refurbishment of Houses: Policy & Regulation: Technology opportunity report (WP6 D3)

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.8: Transitional Retirees

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.1: Busy Starters

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.2: Early Enterprisers

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.3: Greener Graduates

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.5: Urban Constrained

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.6: Successful Ruralites

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.7: Unconvinced Dependent

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Draft Supply Chain Design (WP4 D2) Appendix 1.9: Elderly Established

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4)

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix A - Estimate of Product Volumes

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.1 - Installation Programme Pre 1919 Detached

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.2 - Installation Programme Pre 1919 Mid Terrace

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.3 - Installation Programme 1919-1944 Semi

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.4 - Installation Programme 1945-1965 Semi

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.5 - Installation Programme 1965-1980 Bungalow

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.6 - Installation Programme 1965-1980 Detached

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.7 - Installation Programme 1965-1980 Purpose Built Low Rise Flat

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix B.8 - Installation Programme 1980 Detached

Building Supply Chain for Mass Refurbishment of Houses: Sustainable Supply Chain - Target supply chain scenarios (WP4 D4) Appendix C - Stakeholder Interviews