go to top scroll for more

Biomass to Power with CCS - WP2 High-level Engineering Study: member dissemination event - slide pack


Citation Bhave, A. and Livingston, B. Biomass to Power with CCS - WP2 High-level Engineering Study: member dissemination event - slide pack, ETI, 2012. https://doi.org/10.5286/UKERC.EDC.000021.
Cite this using DataCite
Author(s) Bhave, A. and Livingston, B.
Project partner(s) CMCL Innovations, Doosan
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000021
Download BIO_BI2001_6.pdf document type
Abstract TESBiC: Techno-Economic Study of Biomass to power with CCS. This presentation was used to brief ETI members and advisors on the outcomes of the high level engineering study carried out by the Biomass to Power with CCS project team. It should be read in parallel with the full report: D2.1 Report on Selected Technology Combinations.
Associated Project(s) ETI-BI2001: Techno-Economic Study of Biomass to Power with CCS (TESBIC)
Associated Dataset(s)

Biomass to Power with CCS - Bio IGCC decadal model

Biomass to Power with CCS - Bio amine decadal model

Biomass to Power with CCS - Bio chem loop decadal model

Biomass to Power with CCS - Bio oxy decadal model

Biomass to Power with CCS - Cofire IGCC decadal model

Biomass to Power with CCS - Cofire amine delcadal model

Biomass to Power with CCS - Cofire carb loop decadal model

Biomass to Power with CCS - Cofire oxy decadal model

Associated Publication(s)

Biomass to Power with CCS - Development and Deployment Opportunities Assessment AND Technology and Demonstration Benefits Assessment

Biomass to Power with CCS - ETI Executive Summary

Biomass to Power with CCS - Executive Summary: Technology Landscape report and recommendations

Biomass to Power with CCS Flexible Research Programme Project - Request for Proposal

Biomass to Power with CCS - Model and Sub-model Specification and user Documentation

Biomass to Power with CCS - Model Data Requirements Specification and Model Template Release

Biomass to Power with CCS - model requirements, specification, strategy and user documentation: T3, T4 and T5

Biomass to Power with CCS - model requirements, specification, strategy and user documentation : T6, T7, and T8

Biomass to Power with CCS - One Page Summary

Biomass to Power with CCS - WP1 Detailed Final Report

Biomass to Power with CCS - WP2 High-level Engineering Study: Report on Selected Technology Combinations

ETI Insights Report - The evidence for deploying bioenergy with CCS (BECCS) in the UK

Infographic - 10 years to prepare for a low carbon transition using CCS with Bioenergy

Infographic - Enabling UK biomass

Making efficient use of bioenergy feedstocks for cleaner, greener energy