The TESBiC consortium Biomass to Power with CCS - model requirements, specification, strategy and user documentation: T3, T4 and T5, ETI, 2012. https://doi.org/10.5286/UKERC.EDC.000168. Cite this using DataCite |
Author(s) |
The TESBiC consortium |
Project partner(s) |
CMCL Innovations, The University of Cambridge, Doosan, Drax, EDF, E4Tech, Imperial College London, The University of Leeds |
Publisher |
ETI |
DOI |
https://doi.org/10.5286/UKERC.EDC.000168 |
Download |
BIO_BI2001_19.pdf  |
Abstract |
TESBiC: Techno-Economic Study of Biomass to power with CCS. This document (from Work Package 3) provides the specification and user guidance for three, of eight, parameterised technology models that will be used by the Bioenergy Value Chain Modelling (BVCM) project. The three technologies covered in this report are biomass co-firing in a pulverised coal-fired power plant with post combustion amine scrubbing-based carbon capture, biomass combustion in a dedicated power plant with carbon capture by solvent scrubbing, and biomass co-firing in a large pulverised coal power plant with carbon capture by oxyfuel firing. |
Associated Project(s) |
ETI-BI2001: Techno-Economic Study of Biomass to Power with CCS (TESBIC) |
Associated Dataset(s) |
No associated datasets |
Associated Publication(s) |
Biomass to Power with CCS - Bio amine decadal model Biomass to Power with CCS - Bio chem loop decadal model Biomass to Power with CCS - Bio IGCC decadal model Biomass to Power with CCS - Bio oxy decadal model Biomass to Power with CCS - Cofire amine delcadal model Biomass to Power with CCS - Cofire carb loop decadal model Biomass to Power with CCS - Cofire IGCC decadal model Biomass to Power with CCS - Cofire oxy decadal model Biomass to Power with CCS - Development and Deployment Opportunities Assessment AND Technology and Demonstration Benefits Assessment Biomass to Power with CCS - ETI Executive Summary Biomass to Power with CCS - Executive Summary: Technology Landscape report and recommendations Biomass to Power with CCS Flexible Research Programme Project - Request for Proposal Biomass to Power with CCS - Model and Sub-model Specification and user Documentation Biomass to Power with CCS - Model Data Requirements Specification and Model Template Release Biomass to Power with CCS - model requirements, specification, strategy and user documentation : T6, T7, and T8 Biomass to Power with CCS - One Page Summary Biomass to Power with CCS - WP1 Detailed Final Report Biomass to Power with CCS - WP2 High-level Engineering Study: member dissemination event - slide pack Biomass to Power with CCS - WP2 High-level Engineering Study: Report on Selected Technology Combinations ETI Insights Report - The evidence for deploying bioenergy with CCS (BECCS) in the UK Infographic - 10 years to prepare for a low carbon transition using CCS with Bioenergy Infographic - Enabling UK biomass Making efficient use of bioenergy feedstocks for cleaner, greener energy |
|