Biomass to Power with CCS - WP2 High-level Engineering Study: member dissemination event - slide pack
Citation
Bhave, A. and Livingston, B. Biomass to Power with CCS - WP2 High-level Engineering Study: member dissemination event - slide pack, ETI, 2012. https://doi.org/10.5286/UKERC.EDC.000021. Cite this using DataCite
TESBiC: Techno-Economic Study of Biomass to power with CCS. This presentation was used to brief ETI members and advisors on the outcomes of the high level engineering study carried out by the Biomass to Power with CCS project team. It should be read in parallel with the full report: D2.1 Report on Selected Technology Combinations.