go to top scroll for more

Network Capacity - One Page Summary


Citation Mott MacDonald Network Capacity - One Page Summary, ETI, 2011. https://doi.org/10.5286/UKERC.EDC.000714.
Cite this using DataCite
Author(s) Mott MacDonald
Project partner(s) Mott MacDonald
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000714
Download ESD_EN2002_1.pdf document type
Abstract The UK’s electricity transmission and distribution systems have little spare capacity to accommodate the widespread changes in volume and location of power flows arising from planned changes in generation type and characteristics, and from major changes in demand patterns. Gaining consents for the construction of new overhead lines is extremely time-consuming and costly. Without action, this will increasingly constrain the necessary changes in generation and demand.

The ‘Network Capacity’ project has assessed the feasibility of using new technologies now emerging in the marketplace or in development, including multi-terminal HVDC systems, in novel ways in order to provide increased Transmission & Distribution system capacity and improved management of network power flows, in order to facilitate increased renewable energy installation levels in the UK.
Associated Project(s) ETI-EN2002: Network Capacity
Associated Dataset(s) No associated datasets
Associated Publication(s)

An ETI Perspective - Low carbon challenges for UK energy networks

ETI Insights Report - UK Networks Transition Challenges - Electricity

ETI Insights Report - UK Networks Transition Challenges - Gas

ETI Insights Report - UK Networks Transition Challenges - Heat

ETI Insights Report - UK Networks Transition Challenges - Hydrogen

Enabling efficient networks for low carbon futures: Options for governance and regulation

Infographic - UK Networks Transition Challenges

Network Capacity - Barriers to Application of Multi-Terminal HVDC in the UK: WP2 Task 4

Network Capacity - Barriers to Deployment; and Environmental & Social Impacts of Deployment: WP1 Tasks 4 & 5

Network Capacity - Executive Summary

Network Capacity - Feasibility Assessment of Onshore Multi-Terminal High Voltage Direct Current (HVDC) Systems in the UK

Network Capacity - Final Project Summary (Work Packages 1 & 2 a.k.a. WP1 Task 8)

Network Capacity - Performance of Onshore Multi-Terminal HVDC: WP2 Tasks 2 & 3

Network Capacity - Request for Proposal

Network Capacity - Technology Options, Benefits & Barriers Workshop and Multi-Criteria Assessment: WP1 Tasks 6 & 7

Network Capacity - WP1 Task 1: Assessment of Power Electronic Technologies - A literature review of the relevant power electronic technologies

Network Capacity -WP1 Task 2: Impact of Active Power Flow Management Solutions

Options Choices Actions - UK scenarios for a low carbon energy system

The Networks Jigsaw Event

UK Networks Transition Challenges - A Systems View