Abstract |
This document provides the rationale for, and a description of, the design process covering the design, manufacture and installation, commissioning and operating procedures for the test rig. The scenario of interest is one in which a CCGT/CCGE flames out for whatever reason and for the following few seconds unburnt fuel passes through the turbine (in the CCGT case) without re-igniting and into the exhaust system. |