go to top scroll for more

Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Market and asset modelling results for Scenario 3 and Baringa Reference Case


Citation Baringa Partners LLP Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Market and asset modelling results for Scenario 3 and Baringa Reference Case, ETI, 2017. https://doi.org/10.5286/UKERC.EDC.000874.
Cite this using DataCite
Author(s) Baringa Partners LLP
Project partner(s) Baringa Partners LLP
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000874
Download AdHoc_CCS_CC1011_9.pdf document type
Abstract Various scenarios for the UK’s power fleet composition in 2030 and 2040 were developed. Dispatch modelling in Plexos was carried out by Baringa on these fleets to investigate the role gas fed plants might have in future. This includes the ability to study load factors, stop/starts etc, and together with concomitant pricing, provide a picture of investment remuneration. The effect of key drivers is studied e.g. gas price.

THis slideset summarises:-
  • Comparison of assumptions with Baringa Reference Case
  • Market modelling results for Scenario 3 and Baringa Reference Case
  • Asset modelling results for Scenario 3 and Baringa Reference Case
  • Key conclusions and next steps
Associated Project(s) ETI-CC1011: Salt Cavern Appraisal for Hydrogen Power Generation Systems
Associated Dataset(s)

Hydrogen Turbines Follow On - Scenario 10 Results Spreadsheet - GB Capacity Mix Optimisation - Results

Hydrogen Turbines Follow On - CCS and H2 GT Dispatch modelling scenario 1 and 2 results spreadsheet

Hydrogen Turbines Follow On - Scenario 1,2 and 3 Results Spreadsheet: Role of Gas H2 in the GB power sector - initial analysis

Hydrogen Turbines Follow On - Scenario 5 Results Spreadsheet

Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Scenarios 3 & 4 Results Spreadsheet

Associated Publication(s)

Hydrogen Turbines Follow On - A Review of Selected New CO2 Capture Technologies

Hydrogen Turbines Follow On - Assessment of LMS 100 Heat Management Options and Techno-Economic Parameters of Gas Turbine Power Plants

Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Scenarios 1 & 2 Results Pack

Hydrogen Turbines Follow On - Power Sector CCS and H2 Turbine Asset Modelling - Central Decarb market modelling results

Hydrogen Turbines Follow On - Review of Gas Turbines and their Ability to use Hydrogen-Containing Fuel Gas

Hydrogen Turbines Follow On - Salt Cavern Appraisal for Hydrogen and Gas Storage - Appendices

Hydrogen Turbines Follow On - Salt Cavern Appraisal for Hydrogen and Gas Storage - Final Report

Hydrogen Turbines Follow On - Scenario 10 Results Pack - Cost-optimal pathways to decarbonising the GB power sector - Final Report

Hydrogen Turbines Follow On - Scenario 5 Results Pack - Power sector CCS and H2 Turbine Asset Modelling

Hydrogen Turbines Follow On - Scenarios 1,2 and 3 Results Pack Report - The role of Gas/H2 in the GB power sector - initial analysis