Hydrogen Turbines Follow On - Salt Cavern Appraisal for Hydrogen and Gas Storage - Final Report


Citation Murray, E., Kopan, Y., Yfantis, G., McInroy, D. and Leister, N. Hydrogen Turbines Follow On - Salt Cavern Appraisal for Hydrogen and Gas Storage - Final Report, ETI, 2018. https://doi.org/10.5286/UKERC.EDC.000159.
Cite this using DataCite
Author(s) Murray, E., Kopan, Y., Yfantis, G., McInroy, D. and Leister, N.
Project partner(s) Atkins Ltd
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000159
Download AdHoc_CCS_CC1011_1.pdf document type
Abstract With the growth of renewables, a clean, dispatchable power source will be required in the 2030s. One scheme for providing this involves storing large quantities of H2 in salt caverns, and to use the inventory to produce power or heat during peak hours. Although H2 is stored already in caverns in the UK, there has been little work on the effect of rapid repetitive cycling on cavern integrity. The suitability of UK salt caverns for use in storing H2 in rapid cycle mode is examined, based on detailed geotechnical analysis of saltfields in Yorkshire, Teesside and Cheshire. A detailed analysis is carried out by Atkins on a Cheshire cavern, using a combination of superimposed seasonal and daily demand patterns .The limitations of today’s market offering for firing H2 in gas turbines is described. Outline costing for schemes taking H2 from salt caverns and producing power are presented
Associated Project(s) ETI-CC1011: Salt Cavern Appraisal for Hydrogen Power Generation Systems
Associated Dataset(s)

Hydrogen Turbines Follow On - Scenario 10 Results Spreadsheet - GB Capacity Mix Optimisation - Results

Hydrogen Turbines Follow On - CCS and H2 GT Dispatch modelling scenario 1 and 2 results spreadsheet

Hydrogen Turbines Follow On - Scenario 1,2 and 3 Results Spreadsheet: Role of Gas H2 in the GB power sector - initial analysis

Hydrogen Turbines Follow On - Scenario 5 Results Spreadsheet

Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Scenarios 3 & 4 Results Spreadsheet

Associated Publication(s)

Hydrogen Turbines Follow On - A Review of Selected New CO2 Capture Technologies

Hydrogen Turbines Follow On - Assessment of LMS 100 Heat Management Options and Techno-Economic Parameters of Gas Turbine Power Plants

Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Market and asset modelling results for Scenario 3 and Baringa Reference Case

Hydrogen Turbines Follow On - CCS and H2 Dispatch modelling - Scenarios 1 & 2 Results Pack

Hydrogen Turbines Follow On - Power Sector CCS and H2 Turbine Asset Modelling - Central Decarb market modelling results

Hydrogen Turbines Follow On - Review of Gas Turbines and their Ability to use Hydrogen-Containing Fuel Gas

Hydrogen Turbines Follow On - Salt Cavern Appraisal for Hydrogen and Gas Storage - Appendices

Hydrogen Turbines Follow On - Scenario 10 Results Pack - Cost-optimal pathways to decarbonising the GB power sector - Final Report

Hydrogen Turbines Follow On - Scenario 5 Results Pack - Power sector CCS and H2 Turbine Asset Modelling

Hydrogen Turbines Follow On - Scenarios 1,2 and 3 Results Pack Report - The role of Gas/H2 in the GB power sector - initial analysis