go to top scroll for more

Projects

Projects: Custom Search
Reference Number ETI-CC1026
Title Strategic UK CCS Storage Appraisal
Status Completed
Energy Categories Fossil Fuels: Oil Gas and Coal (CO2 Capture and Storage, CO2 capture/separation) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields SOCIAL SCIENCES (Economics and Econometrics) 25%;
SOCIAL SCIENCES (Business and Management Studies) 25%;
ENVIRONMENTAL SCIENCES (Earth Systems and Environmental Sciences) 50%;
UKERC Cross Cutting Characterisation Not Cross-cutting 75%;
Sociological economical and environmental impact of energy (Environmental dimensions) 25%;
Principal Investigator Project Contact
No email address given
Pale BLue Dot
Award Type Institute Project
Funding Source ETI
Start Date 29 May 2015
End Date 14 December 2016
Duration 19 months
Total Grant Value £2,500,000
Industrial Sectors
Region Scotland
Programme Carbon Capture and Storage
 
Investigators Principal Investigator Project Contact , Pale BLue Dot (99.998%)
  Other Investigator Project Contact , Costain Ltd (0.001%)
Project Contact , Axis Well Technology (0.001%)
Web Site
Objectives
Abstract
  • Project confirms there are no major technical hurdles to storing industrial scale CO2 offshore in the UK with sites able to service mainland Europe as well as the UK
  • 12 month project was carried out by Pale Blue Dot Energy, Axis Well Technology and Costain with 2.5m of funding provided by the Department of Energy and Climate Change (DECC)

Aberdeen-based consultancy Pale Blue Dot Energy supported by Axis Well Technology and Costain delivered a project which identified the next phase of sites deep under the seabed in UK waters to store CO2 emissions from coal and gas power stations and heavy industry plants.

The 12 month project was delivered by the ETI and funded with up to 2.5m from DECC. It progressed the appraisal of five selected storage sites towards readiness for Final Investment Decisions, de-risking these stores for potential future storage developers.

This project identified 20 specific CO2storage sites (from a potential 579 sites) which together represent the tip of a very large strategic national CO2storage resource potential,estimated to be around 78GT (78,000 million tonnes). The top 15% of this potential storage capacity would last the UK around 100 years.

Five of these sites were then selected for further detailed analysis given their potential contribution to mobilise commercial-scale carbon, capture and storage (CCS) projects for power and industrial use in the UK. Outline storage development plans and budgets were prepared for each.

Under the terms of the DECC funding package, the ETI is publishing on its website the detailed reports from the project and providing access to the sub-surface geological models.

The project has built on data from CO2Stored - the UKs CO2storage atlas - a database which was created from the ETIs UK Storage Appraisal Project. This is now publically available and being further developed by The Crown Estate and the British Geological Survey. Information on CO2Stored is available at www.co2stored.co.uk

Data

Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - Captain Subsea Option - MVD (No Goldeneye)

Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - SITE 5: Viking Minimum Viable Development

Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - Site 19: Hamilton Minimum Viable Development

Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - Site 2: Forties 5 - South Site

Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - Site 7: Bunter Closure 36 Minimum Viable Development

Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - Site 7: Bunter Closure 36 Minimum Viable Development

Strategic UK CCS Storage Appraisal Project

Strategic UK CCS Storage Appraisal Project - SITE 14: Captain Aquifer

Strategic UK CCS Storage Appraisal Project - Site 19: Hamilton

Strategic UK CCS Storage Appraisal Project - Site 2: Forties 5 (North and South Combined)

Strategic UK CCS Storage Appraisal Project - Site 5: Viking

Strategic UK CCS Storage Appraisal Project - Site 7: Bunter Closure 36

Projects

No related projects

Publications

Achieving cost-effective CCS: the route forward

An ETI Perspective - Storage, storage, storage -key observations from our Strategic UK CO2 Storage Appraisal project

CCS sector development scenarios in the UK - Final report

Strategic UK CCS Storage Appraisal - Data and Information Requirements

Strategic UK CCS Storage Appraisal - Due Diligence and Portfolio Selection

Strategic UK CCS Storage Appraisal - Initial Screening and Down-Select

Strategic UK CCS Storage Appraisal - Progressing Development of the UK’s Strategic Carbon Dioxide Storage Resource - A Summary of Results from the Strategic UK CO2 Storage Appraisal Project

Strategic UK CCS Storage Appraisal - Prospect Summary Sheets

Strategic UK CCS Storage Appraisal - Request for Proposal

Strategic UK CCS Storage Appraisal - UK CO2 Storage Site Screening and Selection Methodology

Strategic UK CCS Storage Appraisal - WP5 Report - Forties 5 Aquifer Storage Site Selection Study

Strategic UK CCS Storage Appraisal - WP5A - Bunter Storage Development Plan

Strategic UK CCS Storage Appraisal - WP5B - Forties 5 Site 1 Storage Development Plan

Strategic UK CCS Storage Appraisal - WP5C - Hamilton Storage Development Plan

Strategic UK CCS Storage Appraisal - WP5D - Captain X Site Storage Development Plan

Strategic UK CCS Storage Appraisal - WP5E - Viking A Storage Development Plan

Strategic UK CCS Storage Appraisal - WP6 - CO2 Storage Development Build-out

Strategic UK CCS Storage Appraisal Project

Strategic UK CCS Storage Appraisal Project - WP8 Addendum

Added to Database 10/10/18