go to top scroll for more

Multi-time Period Combined Gas and Electricity Network Optimisation

This resource links to a document we hold in our system

Abstract:

A multi-time period combined gas and electricity network optimisation model was developed. The optimisation model takes into account the varying nature of gas flows, network support facilities such as gas storage and the power ramping characteristics of electricity generation units. The combined optimisation is performed from an economic viewpoint, minimising the costs associated with gas supplies, linepack management, gas storage operation, electricity generation and load shedding. It is demonstrated on two case studies, a simple example, and on the GB network.

Publication Year:

2007

Publisher:

UKERC

DOI:

No DOI minted

Author(s):

Chaudry, M., Jenkins, N. and Strabc, G.

Language:

English

File Type:

application/pdf

File Size:

668277 B

Rights:

Open Access

Rights Overview:

This data may be freely used for any purpose

Further information:

N/A

Region:

United Kingdom

Publication Type:

Working Paper

Theme(s):

UKERC Phase 1

Related Dataset(s):

No related datasets

Related Project(s):

No related projects

Related Publications(s):

No related publications