go to top scroll for more

Network Capacity - Request for Proposal

This resource links to a document we hold in our system

Abstract:

The electricity transmission and distribution (T&D) systems in the UK have evolved incrementally over time in response to changing generation and demand patterns, with their original design topologies having been developed assuming a centralised energy delivery model, whereby bulk electrical power is generated by a relatively small number of very large power stations (e.g. coal, nuclear, etc) and is transmitted to customers via an interconnected electrical grid system.

To date,this approach has provided a secure energy delivery system, but has also resulted in the T&D system having little spare capacity to accommodate widespread changes in generation type and characteristics,or majorchanges in demand patterns.It is also clear that achieving the long-term government targets for CO2 emissions reduction and renewablepower generation technology installation will have a major impacton the volume and location of power flows throughout the UK’s T&D network. Managing thesechanges will provide significant challenges, especially given the difficulties and timescales associated with gaining consents for the construction of new overhead line infrastructure.

This project addresses the capacity of the UK’s onshore T&D systems. Offshore electrical systems are excluded from the scope of this project and are being addressed by a separate project. This project consists of two Work Packages:

  1. Feasibility of new technology application:Assessment ofthe feasibility of using new technologies now emerging in the marketplace, and those in development, to provide increased T&D capacity and improved management of network power flows, in order to facilitate increasedrenewable energy installation levels in the UK.
  2. Feasibility of onshore multi-terminal HVDC:Assessment of the technical feasibility of an onshore multi-terminal HVDC systemdeployed in the UK, its performance when integrated with an existing AC gridnetwork, and the technology implications and benefits case for the conversion of existing AC lines to DC operation.
This document is the call for proposals for this project.

Publication Year:

2009

Publisher:

ETI

Author(s):

ETI

Energy Category

Language:

English

File Type:

application/pdf

File Size:

591884 B

Rights:

Energy Technologies Institute Open Licence for Materials

Rights Overview:

The Energy Technologies Institute is making this document available to use under the Energy Technologies Institute Open Licence for Materials. Please refer to the Energy Technologies Institute website for the terms and conditions of this licence. The Information is licensed "as is" and the Energy Technologies Institute excludes all representations, warranties, obligations and liabilities in relation to the Information to the maximum extent permitted by law. The Energy Technologies Institute is not liable for any errors or omissions in the Information and shall not be liable for any loss, injury or damage of any kind caused by its use. This exclusion of liability includes, but is not limited to, any direct, indirect, special, incidental, consequential, punitive, or exemplary damages in each case such as loss of revenue, data, anticipated profits, and lost business. The Energy Technologies Institute does not guarantee the continued supply of the Information. Notwithstanding any statement to the contrary contained on the face of this document, the Energy Technologies Institute confirms that it has the right to publish this document.

Further information:

N/A

Region:

United Kingdom

Publication Type:

Proposal Request

Theme(s):

Energy Storage and Distribution

Related Dataset(s):

No related datasets

Related Project(s):

Network Capacity

Related Publications(s):

An ETI Perspective - Low carbon challenges for UK energy networks

ETI Insights Report - UK Networks Transition Challenges - Electricity

ETI Insights Report - UK Networks Transition Challenges - Gas

ETI Insights Report - UK Networks Transition Challenges - Heat

ETI Insights Report - UK Networks Transition Challenges - Hydrogen

Enabling efficient networks for low carbon futures: Options for governance and regulation

Infographic - UK Networks Transition Challenges

Network Capacity - Barriers to Application of Multi-Terminal HVDC in the UK: WP2 Task 4

Network Capacity - Barriers to Deployment; and Environmental & Social Impacts of Deployment: WP1 Tasks 4 & 5

Network Capacity - Executive Summary

Network Capacity - Feasibility Assessment of Onshore Multi-Terminal High Voltage Direct Current (HVDC) Systems in the UK

Network Capacity - Final Project Summary (Work Packages 1 & 2 a.k.a. WP1 Task 8)

Network Capacity - One Page Summary

Network Capacity - Performance of Onshore Multi-Terminal HVDC: WP2 Tasks 2 & 3

Network Capacity - Technology Options, Benefits & Barriers Workshop and Multi-Criteria Assessment: WP1 Tasks 6 & 7

Network Capacity - WP1 Task 1: Assessment of Power Electronic Technologies - A literature review of the relevant power electronic technologies

Network Capacity -WP1 Task 2: Impact of Active Power Flow Management Solutions

Options Choices Actions - UK scenarios for a low carbon energy system

The Networks Jigsaw Event

UK Networks Transition Challenges - A Systems View