go to top scroll for more

ETI Insights Report - The role for nuclear within a low carbon energy system


Citation Middleton, M. ETI Insights Report - The role for nuclear within a low carbon energy system, ETI, 2015. https://doi.org/10.5286/UKERC.EDC.000610.
Cite this using DataCite
Author(s) Middleton, M.
Project partner(s) ETI
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000610
Download Nuclear-Insights-Midres-AW.pdf document type
Abstract In March 2015 the Energy Technologies Institute (ETI) published “Options Choices Action” featuring two contrasting scenarios - “Patchwork” and “Clockwork” - for a UK low carbon energy system transition to 20501. New nuclear power stations featured as a prominent component of both scenarios. In this context the ETI has commissioned new analysis of how large and Small Modular Reactor (SMR) nuclear technologies can contribute to decarbonising the UK energy system. For this purpose, SMRs are defined as modular for the purpose of incremental addition to power station capacity, and with an electrical generation capacity in units of 300 MWe or less. The emergence of multiple developing SMR designs opens up the potential to deploy a wider range of nuclear technologies within an integrated energy system.This document summarises the insights from three ETI activities undertaken in 2014 and 2015:
  • Power Plant Siting Study (PPSS) -delivered for the ETI by Atkins
  • System Requirements For Alternative Nuclear Technologies (ANT) - deliveredfor the ETI by Mott MacDonald with technical support from Rolls-Royce
  • In-house ETI energy system modelling and analysis incorporating the learning from the PPSS and ANT projects
This analysis has created new understanding of the potentially different contributions from large baseload reactors and SMRs in the UK energy system. These two nuclear technologies can offer potentially complementary roles in baseload and flexible CHP generation, and also in terms of the location of development sites. Generation IV nuclear technologies are not considered in detail in any of the projects above, but are recognised as a new type of reactor technology potentially available for deployment from 2040 onwards. The PPSS recognises the need to allocate site capacity for such reactors; without suitable sites such future designs could not be built.
Associated Project(s) ETI-ST2033: System Requirements for Alternative Nuclear Technologies
Associated Dataset(s) No associated datasets
Associated Publication(s)

Infographic - New Nuclear plants and transition to low carbon

Infographic - Preparing for Deployment of a UK Small Modular Reactor by 2030

List of projects for the ETI Nuclear (NUC) Programme

System Requirements for Alternative Nuclear Technologies - Overview & Key Findings (Presentation)

System Requirements For Alternative Nuclear Technologies (Phase 3) - Technical assessment of SMR heat extraction for district heat networks - Final Report

System Requirements for Alternative Nuclear Technologies - Presentation - Approach and Findings

System Requirements For Alternative Nuclear Technologies - Project Summary Report

System Requirements for Alternative Nuclear Technologies - Request for Proposals

System Requirements for Alternative Nuclear Technologies - Using small modular reactors to supply district heat networks