The data is from tests performed at The University of Sheffield, on a 1MWh/2MW lithium-titanate battery energy storage (BESS) by Toshiba SCiB Technology, within the EPSRC funded Multi-scale ANalysis for Facilities for Energy STorage (Manifest) Project EP/N032888/1. The system is connected directly to the grid through an 11kV feed, located at Willenhall Primary Substation. Interfacing to grid is achieved through a 2.2MVA ABB PCS100 inverter, and a 2.1MVA dry-type transformer with 1:30.55 ratio. The main parameters are related to time-series of grid voltage and frequency, AC and DC voltages and currents, operating conditions (such as for example room temperature), etc.
The experimental background is explained in Experiment_Description_Readme.pdf
The data are time-stamped in the format MM/DD/YYYY HH:MM:SS UTC, while the parameters are given using the International System of Units.This catalogue entry was updated on 2021-02-03 to link directly to the data from the calibration test carried out on 2017-03-01. Previously it linked to the top level of the Sheffield BESS test data at https://data.ukedc.rl.ac.uk/browse/edc/power/storage/MANIFEST/Sheffield. The title was updated to include the words "Calibration Test" to differentiate it from other tests carried out with the Sheffield BESS facility. The previous title was "EPSRC ManIfest Battery Energy Storage System (BESS) The University of Sheffield". No changes have been made to the dataset and no other changes have been made to this catalogue record.
Creator:
Shahab Nejad, The University of Sheffield
Publisher:
Shahab Nejad, The University of Sheffield
DOI:
No DOI minted
Citation (APA Style 7th Edition):
Shahab Nejad, The University of Sheffield (2017). EPSRC Manifest Battery Energy Storage System (BESS) Calibration Tests, The University of Sheffield [Data set]. Shahab Nejad, The University of Sheffield. https://ukerc8.dl.ac.uk/cgi-bin/dataDiscover.pl?Action=detail&dataid=6d0db993-34bb-4ed0-8d66-15ba61151bd6
Energy Category
Field Dates:
01/03/2017 - 01/03/2017
Data Date Range:
01/03/2017 - 01/03/2017
Data type:
Time Series
Data format:
text/csv
Language:
English
Number of Units:
1
Unit Type:
Battery Test Facility
Number of Records:
5270
Parameters:
Date and UTC time, Frequency of the grid (Hz), Real power exchanged with the grid P (kW), Reactive power exchanged with the grid Q (kVAr), State of Charge SoC (%), DC voltage (V), DC current (A), average AC voltage (V), the average AC current (A), battery ambient temperature (Degrees C)
Rights:
Open Access
Rights Overview:
This data may be freely used for any purpose
Further information:
N/A
Region:
Sector:
Subject:
Related Dataset(s):
EPSRC Manifest Battery Energy Storage System (BESS) Efficiency Tests, The University of Sheffield
EPSRC Manifest Battery Energy Storage System (BESS) The University of Manchester
EPSRC Manifest Energy Storage System (ESS) Calibration Test, Newcastle University
EPSRC Manifest Energy Storage System (ESS) Efficiency Test, Newcastle University
EPSRC Manifest Energy Storage System (ESS) Latency Test, Newcastle University
EPSRC Manifest Supercapacitor System Efficiency Test, Newcastle University
Related Project(s):
Multi-scale ANalysis for Facilities for Energy STorage (Manifest)
Related Publications(s):
No related publications
The Energy Data Centre works in collaboration with the CEDA Archive to provide this information