go to top scroll for more

Projects

Projects: Projects for Investigator
Name:   Project Contact
Organisation:   ABB Group (International), Switzerland
Department:   None
 
EP/X031470/1 I Automatic Control Engineering (ACE) Network
EP/W034514/1 I Design and Verification of Time-Critical Byzantine Fault-Tolerant Systems
EP/V042432/1 I Digital Circular Electrochemical Economy (DCEE)
EP/R026173/1 I UK Robotics and Artificial Intelligence Hub for Offshore Energy Asset Integrity Management
EP/I038543/1 I Vehicle Electrical Systems Integration (VESI)
EP/F029128/1 I WAMS based self-tuning FACTS controllers for improved utilisation of existing power transmission assets
P: Principal Investigator    O: Other Investigator    R: Recognised Researcher    I: Industrial Collaborator   
Project List Summary
for Project Contact
Funded Started Completed Total £ Value   Total Project
£ Value
  
0 3 3 6 0   20,563,598