go to top scroll for more

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) - Executive Summary


Citation ETI Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) - Executive Summary, ETI, 2011. https://doi.org/10.5286/UKERC.EDC.000856.
Cite this using DataCite
Author(s) ETI
Project partner(s) ETI
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000856
Download LDV_TR1002_3.pdf document type
Abstract The Plug-in Vehicle Economics and Infrastructure Project is a core element of Electrification of Transport within Test Bed UK. The ETI will utilise the outputs of the project to support, inform and facilitate effective long-term benefits from the investments being made around the UK. The two primary objectives are:
  1. Evaluate the potential role and economics of plug-in vehicles in the low carbon transport system: generate a quantified understanding of the market potential, cost models and carbon benefits case under defined scenarios of infrastructure investments, government intervention packages and finance model options across a number of key plug-in vehicle type/size/capability points; and
  2. Develop the technology tool-kit for delivering an intelligent infrastructure: create a verified open interoperability architecture and generate information to aid infrastructure planning (e.g. to indicate how many recharging points are needed and where they should be located, what mix of power levels are required, how the impact of plug-in vehicle recharging on the electricity distribution network should be managed, how the overall system can be simplified for consumers, etc).
The Electricity Distribution and Intelligent Infrastructure project (TR1002) is comprised of six Work Packages. This is the executive summary for Work Package 2.4, Intelligent Architecture.
  • This work package identified six principal actors:
    • Government & Regulation
    • Electric Vehicle Charging Services
    • Vehicle and Infrastructure Providers
    • Other Service Providers
    • Electricity Supply Chain
    • Electric Vehicles and Owners / Users
  • From the information flow and motivations between these actor, an an open architecture solution is proposed.
  • Implementation could be
    • Strategic, ie planned for long term results on a large scale, or
    • Organic ie piecemeal, adapting to immediate local needs.
  • Standards will be needed to allow interconnectivity of devices and data flow.
  • Recommended next steps include
    • Publication and wide dissemination of the proposed system architecture.
    • Ongoing engagement of a broad range of stakeholders
    • Investment in a demonstration project
    • Engagement of key stakeholders in the Government and regulatory space
Associated Project(s) ETI-TR1002: PIVEI: Large Scale Consumer Trial S1 SP2 - Electricity Distribution and Intelligent Infrastructure
Associated Dataset(s) No associated datasets
Associated Publication(s)

Electricity Distribution and Intelligent Infrastructure - Charging Network Requirements Report (WP2.2)

Electricity Distribution and Intelligent Infrastructure - Costs and Supply Chain Analysis Report - Plug-In Electric Vehicles Charging Infrastructure (WP2.2)

Electricity Distribution and Intelligent Infrastructure - Electricity Distribution Network Assessment and Analysis (WP2.1)

Electricity Distribution and Intelligent Infrastructure - Executive Summary of Recharging Network Requirements (WP2.2), Recharging Infrastructure Cost Driver Analysis (WP2.3) and Rechargin Infrastructure Implementation (WP2.5)

Electricity Distribution and Intelligent Infrastructure - Plug-in Vehicle Economics and Infrastructure Project: Electricity Distribution and Intelligent Infrastructure - Request for Proposals

Electricity Distribution and Intelligent Infrastructure - Recharging Infrastructure Implementation Recommendations (WP 2.5)

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix A1: Intelligent Infrastructure Requirements

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix A2: Intelligent Infrastructure Standards Requirement

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix B: Conceptual Business Architecture

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix C1: Conceptual Application Architecture

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix C2: Conceptual Data Architecture

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix C3: Conceptual Technical Architecture

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix D1: Plan for Architecture Realisation

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix D2: Standards Gap Assessment Report

Electricity Distribution and Intelligent Infrastructure - Systems Integration and Architecture Development (WP2.4) Final Report Appendix D3: Delivery Phases, Options, Costs and Risks

Electricity Distribution and Intelligent Infrastructure - WP2.1 Network Analysis - Executive Summary